Forbo fitting, nationwide
Supplying the floor is the easy part. DCTUK fits the full Forbo range across the United Kingdom — survey, preparation, installation and disposal, by employed fitting teams.

What DCTUK commits to
| Site survey | Free, within 72 hours |
|---|---|
| Typical programme | Around 15 working days from first call to fitted floor |
| Pricing | Fixed price, no hidden charges |
| Fitting warranty | 12 months |
| Design service | Free — floor layouts and colour selection |
| Old flooring | Uplifted, removed and recycled, with a carbon savings certificate |
| Delivery | Just-in-time to site |
| Payment | Option to spread over 3 or 12 months |
| Coverage | Nationwide, United Kingdom |
The subfloor is where projects go wrong
Almost every flooring failure is a subfloor failure. A tile that telegraphs every ridge in the screed, or lifts at the corners because the slab was still wet, is rarely a product fault.
- Moisture testing. A new concrete slab takes roughly one day per millimetre for the first 50mm to dry under good conditions, and longer below that. If it is not dry, a damp proof membrane is not optional.
- Smoothing compound. Textile flooring telegraphs trowel marks and old adhesive residue far more than people expect — and Flotex, being thinner at 5mm, telegraphs more than a thicker tufted tile.
- Tackifier versus permanent adhesive. Tackifier holds tiles while allowing clean lift for replacement and reclamation. Permanent adhesive belongs on ramps, in heavy trolley environments and anywhere lateral shear is severe.
- Flotex in wet areas. Where the floor will genuinely be wet-cleaned regularly, the adhesive and perimeter detailing need specifying accordingly. Waterproof flooring on an unsealed perimeter is only half a solution.
Layout options
| Monolithic | All units in the same direction. The most seamless, broadloom-like result; least forgiving of shading and individual replacement. |
|---|---|
| Quarter-turn | Each tile rotated 90° from its neighbour. The safe default — hides shading, tolerates replacement, forgiving of almost everything. |
| Brick bond | Rows offset by half a module. Standard for planks, softer grid for tiles. |
| Ashlar | Plank rows offset by a third or quarter. Strongly linear — good for corridors and direction. |
| Herringbone | Planks at 90° in a zigzag. Highest impact, highest wastage, highest labour. Worth it in a reception, rarely across a floorplate. |
Directional ranges need the laying pattern named in the specification, not left to the fitter. Tessera Inline in particular reads as a continuous grain laid monolithically and as a basket-weave laid quarter-turned — two completely different floors from one product.
Wastage: 5–7% for square tiles on a rectangular floor, 10–12% for plank and herringbone layouts, more where there is heavy cutting.
Maintenance
Tessera
- Barrier matting at every external entrance — a minimum of two strides in each direction of travel, more where weather or vehicles cross the threshold. It is the single highest-return decision in a flooring budget.
- Vacuum daily in circulation, weekly elsewhere. Dry soil is abrasive and cuts fibre; wet soil stains.
- Spot clean immediately. Solution dyed ranges tolerate aggressive cleaning agents including dilute bleach without colour loss.
- Periodic low-moisture encapsulation or hot water extraction depending on soiling.
- Rotate tiles at year five to seven where the design allows.
Flotex
Different rules, and simpler ones. Vacuum as normal, but where a carpet would need specialist periodic treatment, Flotex can simply be washed — mopped, scrubbed or machine cleaned — and dries in 4–6 hours. That is why it ends up in canteens, nurseries and care homes: the maintenance regime is closer to a resilient floor than a textile one.
Frequently asked questions
Does DCTUK fit Forbo flooring nationwide?
Yes, across the United Kingdom, using employed fitting teams. See the Forbo fitting service.
How quickly can you fit?
Free site survey within 72 hours, and typically around 15 working days from first call to fitted floor.
Do you remove the old flooring?
Yes — uplift, removal and recycling of existing floorcoverings are included, with a carbon savings certificate.
Is there a fitting warranty?
Yes, 12 months on the installation, alongside the manufacturer's own product warranty.
How much wastage should I allow?
Typically 5–7% for square tiles on a straightforward rectangular floor, rising to 10–12% for plank and herringbone layouts.